Roma Herringbone Installation Instructions

Standard Unilin Click System & A/B Plank Alignment Guide

Pre-Installation Checklist

48-Hour Acclimatization

Keep closed boxes in the target installation room for at least 48 hours at a temperature of 18-24°C and relative humidity of 40-60%.

Subfloor Condition Check

The subfloor must be dry, clean, structurally sound, and level. Any unevenness greater than 2mm per 1 meter run must be leveled.

Moisture Barrier & Underlay

A PE vapor barrier film (min 0.2mm) is mandatory over concrete. Install acoustic underlayment perpendicular to the parquet plank direction.

Acquire Expansion Spacers

Acquire spacers to maintain a 10mm expansion gap along all walls, pipes, thresholds, and fixed vertical structures.

Roma Herringbone Layout Pattern

DIAGRAM
Herringbone Pattern Layout Diagram

CRITICAL: Underfloor Heating Requirements

Underfloor heating systems must be turned off 48h before installation and started gradually (5°C increments per day) 48h after installation. Maximum surface temperature must not exceed 27°C.

PROHIBITED: Mechanical Fixation Warning

Laminate flooring is designed to be installed exclusively as a floating floor. Never nail, screw, glue, or rigidly fix the boards to the subfloor or baseboards, as they need to expand and contract.

Installation Step-by-Step Procedure

1

1. Determine Room Center Line

Measure the room precisely and snap a chalk line down the center. Herringbone must start along this central axis to ensure a symmetric layout and balanced border cuts at the left and right walls.

Tip: A centered starter line prevents the pattern from drifting diagonally as you build.
Step 1 Diagram
2

2. Prepare A and B Planks

Roma Herringbone uses mirroring click mechanisms, divided into Left (A) and Right (B) boards. Organize your workspace by sorting them into separate stacks before starting. Installing two identical planks will block the pattern.

Tip: The boxes are marked. Open multiple boxes to mix different wood grains for a natural look.
Step 2 Diagram
3

3. Build the Starter Triangle

Construct a 'starter triangle' using 6-8 connected A and B boards. Place this triangle apex directly on the center line. Check squareness with a laser line or carpenter's square. Temporarily anchor it to avoid drift.

Tip: The starter rows dictate the alignment of the entire room. Take extra time to make this perfect.
Step 3 Diagram
4

4. Click-Locking Technique

Join planks at a 45-degree angle. Insert the tongue of the new board into the groove of the installed board, push down flat, and gently tap with a rubber mallet and a laminate tapping block.

Tip: Never hit the boards directly with a hammer; always use the specialized tapping block to protect joints.
Step 4 Diagram
5

5. Laying Subsequent Rows

Work in alternating columns. Lay A planks clicking into B planks, then B planks clicking into A planks. Maintain the central layout flow and continuously verify that joints are completely tight.

Tip: Clean any debris from the groove before clicking to avoid gaps.
Step 5 Diagram
6

6. Edge Cuts & Expansion Gaps

Cut border planks at a 45-degree angle to fit the perimeter walls. Use a pull-bar to secure the final cut pieces into place. Ensure a 10mm expansion gap is maintained with wall spacers.

Tip: Wall baseboards will fully hide the 10mm expansion gap.
Step 6 Diagram
30 YEARS WARRANTY

Installation Policy & Warranty

Bella Floor's 30-year residential warranty requires compliance with these official installation manuals. Damage caused by improper subfloor flatness, lack of expansion gaps, or steam mops is not covered.

Technical Support Desk

For detailed commercial project requirements, concrete slab dampness testing reports, or locking profile tolerances, contact our engineering support desk.

Email: [email protected] | Phone: +90 216 123 4567